Iverywhere
Implementation Roadmap — Website Redesign
July 2, 2026 → Launch Tuesday, September 1, 2026 · 8½ weeks
← Research index
AS-BUILT · updated 2026-07-08. The full v5 site shipped ahead of this schedule — built and published live (password-gated until Sept 1). This roadmap is kept as the plan of record; what remains is a short punch list: per-SKU measurements → size guide, the ~Jul 24 studio shoot + real packshots, building the Klaviyo welcome flow, checkout visual branding, and the lookbook.

How the research catalog becomes the live site, in four phases against the September 1 launch. Two owners throughout: Build (Claude working sessions with Trevor) and Founders (Trevor + Haley — shoots, measurements, copy approvals, Shopify admin). The full site has since shipped (see banner above); the phases below stand as the original plan, with completed work marked ✓ and the still-open items left intact.

W1
Jul 6
W2
Jul 13
W3
Jul 20
W4
Jul 27
W5
Aug 3
W6
Aug 10
W7
Aug 17
W8
Aug 24
Launch
Sep 1
Phase 1 — Pre-launch shell (W1–2) · Phase 2 — Shop room (W3–5) · Phase 3 — World room (W6–7) · Phase 4 — Hardening & launch (W8)

The critical path

Three chains determine the date; everything else flexes around them:

Gate 0 — this week (by Jul 5) · closed Jul 8
①, ② and ④ are moot — the recommendations shipped as built, theme tooling is in place, and the About copy is live. ③ still applies to the open studio shoot: confirm sample availability for all 8 pieces ahead of ~Jul 24.

Phase 1 — Pre-launch shell · W1–W2 · Jul 6–19 · ✓ build done Jul 8 — two items open below

TaskOwnerEffortDepends on
Password page — "The Film Still" (Como loop, one serif line, hairline email field; replaces the off-system page) — briefBuild½ day
Header — "The Row split" (hairline text band; transparent over film heroes, solid ivory in the shop; retire announcement bar; shipped nav = Shop · Sets · Journal · About) — brief retiredBuild1–1½ days
Footer — "The Ledger" (3 micro-label columns; remove footer newsletter; quiet close owns email site-wide) — brief retiredBuild½–1 dayAdmin menus set up (Founders, 30 min)
✓ Content fixes: About copy (three girls; trip history), retire announcement messagesBuild + Founders1 hrGate 0 ④
Klaviyo connected — customer pipeline live, double opt-in, branded transactional emails. Still open: build the 3-email welcome flow in the Klaviyo dashboard (welcome + world tease + launch-week first-access window)Founders1 day
Founder homework: per-SKU measurements off samples, in/cm; Mini age↔height bands; fit note per pieceFounders1 eveningSamples in hand
Gate 1 — end of W2 (Jul 19)
Password page live to the world · header/footer on-system · welcome flow sending · measurements delivered → unblocks the size guide. Jul 8: first two done; welcome-flow build and measurements still open.

Phase 2 — The shop room · W3–W5 · Jul 20–Aug 9 · ✓ build shipped early — shoot & size guide open

Founder production (W3–W4)

TaskOwnerEffortDepends on
Studio shoot (Shoots 1+2 combined): ~20–24 scale-matched packshots on warm-ivory seamless (Women/Men/Mini, identical frame geometry), 8–10 on-model hover frames, per-PDP details + packs-flat loop + flat-lay, one parent+child pair shot per style, 3–4 wide family interrupts, gift-card face — open, ~Jul 24; real packshots replace the vendor mock-ups currently on the live siteFounders2 shoot days + prepAll samples; shot list in master asset list
✓ Product data sheet: names, prices, fabric/care copy, coordinates_with pairings, style_family groupingsFounders½ day

Build (W3–W5, in parallel)

TaskOwnerEffortDepends on
Size guide (WOMEN / MEN / THE MINI ruled tables, age+height first for kids, in/cm toggle, how-to-measure) — briefBuild1 dayGate 1 measurements
✓ Shopify admin: products, variants, prices, collections, metafield definitions (custom.coordinates_with, custom.style_family, custom.fit)Build + Founders1 dayProduct data sheet
PLP — "The Family Grid" (style-grouped blocks, Women/Men/Mini rows at matched scale, family interrupts, zero filter apparatus) — briefBuild2–3 daysPackshots + metafields
PDP — "The Pairing Card" (stacked gallery, size pills, sticky buy box, accordions, "The Matching Mini" card) — briefBuild2–3 daysPDP shots + coordinates_with
Cart — "Quiet Ledger, plus the Mini line" (drawer restyle, one Complete-the-set row, gift note, threshold sentence) — briefBuild1–2 daysMetafields; packaging confirmed for gift note
✓ Search restyle + no-results state · pure-type 404 · FAQ · contact · shipping/returns — briefBuild2 daysReturns policy decision (30-day + free first exchange)
Gate 2 — end of W5 (Aug 9)
Full buying path works end-to-end behind the password: PLP → PDP → cart → checkout test order, with size guide live. If the shoot slipped, PLP/PDP ship on graded trip photography as a fallback and packshots swap in when ready. Jul 8: done — buying path verified with a test order (sized ATC + bundle line-item properties fixed); real packshots swap in after the ~Jul 24 shoot.

Phase 3 — The world room · W6–W7 · Aug 10–23 · ✓ built early except lookbook

TaskOwnerEffortDepends on
About — long-scroll film page (reuses existing iv-* sections; founder portrait + Sydney origin frame + provenance beat) — briefBuild1–2 daysFounder portrait picked from library or one quick shot
Trip guides #1–2: Como + Sydney (hero + 4–6 frames from the graded library; 600–900 words each — I draft from trip facts, founders edit) + journal index + trip-guide article templateBuild + Founders2–3 daysFounder copy review
✓ "Shop the trip" city edits (tag products trip:como etc., edit sections on guide pages)Build1 dayProducts live (Gate 2)
Lookbook Season 1 (12–20 parent+child looks, titled, look→SKU map)Founders + Build1 shoot day + 1 build dayDecision: shoot pre-launch or ship world room with About + guides and add lookbook in Sept
Gate 3 — end of W7 (Aug 23)
World room live behind the password: About + two trip guides + shop-the-trip. Lookbook is the one deliberately floatable item — the world launches full without it. Jul 8: world room live; lookbook still open.

Phase 4 — Hardening & launch · W8 · Aug 24–Sep 1 · ✓ hardening done early — launch flip remains

TaskOwnerEffortDepends on
✓ Videos → Shopify Files CDN URLs (hero, moment, packs-flat loops); LCP pass (eager hero poster, preloads, no fade on LCP image); Core Web Vitals checkBuild1 day
✓ Full QA: mobile-first sweep of every template, theme-editor lifecycle (section load/unload), reduced-motion, cross-browserBuild1–2 daysGates 2–3
✓ Commerce config: shipping rates, taxes, payments, legal/policy pages, end-to-end test orders + a real refund. Still open: checkout visual brandingFounders + Build1 day
✓ SEO/meta: titles, descriptions, og:image (graded stills), favicon, 301s from any old URLsBuild½ day
Gift-card issued-page restyle; accounts doorway (login/register) restyle — only if the week is cleanBuild1 dayEverything above green
Launch, Tuesday Sept 1: password off · first-access email to the list (24–48h window honored) · IG bio flipFoundersAll gates

Post-launch backlog · September onward

Risks & honest assumptions